The guide · PDF, 4 pages
LCOE — the levelised cost of energy
Derived, worked on a 100 MW solar plant and stress-tested: the levelised tariff, three perspectives, real or nominal, and where it misleads.
The flat price per MWh that pays back a plant’s whole life of costs, with a return — how it is worked out, and where it misleads.
By Mayank Jain ·
LCOE — the levelised cost of energy — 4 pages, free to read.
What it is
The levelised cost of energy (LCOE) is the constant price per unit of energy at which a plant’s lifetime revenue would exactly pay for its lifetime costs, including a return on the capital.
It puts a solar farm, a wind farm and a gas plant on one number. It is also the floor below which a tariff loses money.
How it is worked out
Suppose the plant sells every MWh at one price, T. The tariff just pays for the plant when the present value of the revenue equals the present value of the costs:
Σ T × Et ÷ (1 + r)t = Σ Ct ÷ (1 + r)t ⇒ LCOE = T = PV(costs) ÷ PV(energy)Et the energy sold in year t, Ct the capital and operating costs in year t, r the discount rate
That is why the energy is discounted too. A MWh does not “lose value”; the revenue it earns does. Undiscounted costs divided by undiscounted energy give a different — and wrong — number.
The guide’s plant: USD 60 mn spent at the start, a 22% capacity factor (192,720 MWh in the first year), 0.5% degradation a year, USD 1.0 mn a year to operate, 25 years, and a real discount rate of 7%.
For a plant paid for mostly up front, the discount rate and the capacity factor dominate. In the example, a rate of 5% or 9% gives 28.6 or 38.3; a capacity factor of 24% or 20% gives 30.5 or 36.6; the capital cost 10% lower or higher gives 30.5 or 36.1. Two points on the rate move the LCOE by about 15% — as much as 10% on the capital cost. Cheap, long-tenor debt and a good site matter as much as cheap panels.
The figure above is cost-based: capital and operating costs at one rate, usually the WACC, before tax. A bidder needs more — the tariff must also pay the tax, meet the lenders’ cover ratios and give the equity its return. The levelised tariff is the flat price that brings the equity to its target return in the full model. For the same plant, with 70% debt at 6% over 18 years, 25% tax and a 10% equity return, it is about USD 37.5 per MWh.
What to watch for
The example is in today’s money: USD 33.3 means a tariff that starts at 33.3 and rises with inflation. A tariff that stays flat in money terms must start higher — with 2.5% inflation, at about USD 41.5. Always say which one a figure is, and never compare a real LCOE with a nominal tariff.
Read and watch
The guide · PDF, 4 pages
Derived, worked on a 100 MW solar plant and stress-tested: the levelised tariff, three perspectives, real or nominal, and where it misleads.
Also in the Knowledge Center · PDF, 5 pages
NPV, IRR, payback and MOIC; the cost of equity and the WACC; why the project and equity values differ; buying a stake; terminal value.
Because the revenue it earns is. The LCOE is the flat price at which the present value of the revenue equals the present value of the costs, and each year’s revenue is that price times that year’s energy. Dividing undiscounted costs by undiscounted energy gives a different, wrong number.
For a cost-based LCOE, usually the project’s WACC, before tax — and the same rate for every option you compare. Real cash flows go with a real rate, nominal ones with a nominal rate.
The cost-based LCOE covers the capital and operating costs at one rate. The levelised tariff is the flat price at which the equity reaches its target return in the full model, after tax and the lenders’ cover ratios. In the guide’s example they are USD 33.3 and about USD 37.5 per MWh.
No. Not every MWh is worth the same, firm power costs more, grid and balancing costs may sit outside it, and the risk hides in the discount rate. A merchant plant and a contracted one with the same LCOE at the same rate are not equally good.
In the Studio
Output › Returns shows the cost-based LCOE with its parts, the revenue-based levelised tariff and the margin between them, the EPC view and the offtaker’s cost with grid charges — at the project’s WACC and at the offtaker’s own rate side by side, per kWh or per MWh. The inputs are in Valuation › Levelised cost of energy, and the Excel workbook calculates the same with XNPV on the model’s dates.