Mayank Jain.Project Finance Studio

LCOE — the levelised cost of energy

The flat price per MWh that pays back a plant’s whole life of costs, with a return — how it is worked out, and where it misleads.

By Mayank Jain ·

Build this in Project Finance Studio Read the guide (PDF)

LCOE — the levelised cost of energy — 4 pages, free to read.

The LCOE both ways — the energy discounted, the cost-based LCOE from its parts, the levelised tariff and the margin between them. Nothing downloads until you press play. Watch it on Learn, with chapters

What it is

One number for a whole life

The levelised cost of energy (LCOE) is the constant price per unit of energy at which a plant’s lifetime revenue would exactly pay for its lifetime costs, including a return on the capital.

It puts a solar farm, a wind farm and a gas plant on one number. It is also the floor below which a tariff loses money.

How it is worked out

The formula, and one plant

Suppose the plant sells every MWh at one price, T. The tariff just pays for the plant when the present value of the revenue equals the present value of the costs:

Σ T × Et ÷ (1 + r)t = Σ Ct ÷ (1 + r)t ⇒ LCOE = T = PV(costs) ÷ PV(energy)Et the energy sold in year t, Ct the capital and operating costs in year t, r the discount rate

That is why the energy is discounted too. A MWh does not “lose value”; the revenue it earns does. Undiscounted costs divided by undiscounted energy give a different — and wrong — number.

Worked on a 100 MW solar plant

The guide’s plant: USD 60 mn spent at the start, a 22% capacity factor (192,720 MWh in the first year), 0.5% degradation a year, USD 1.0 mn a year to operate, 25 years, and a real discount rate of 7%.

  • PV of the costs = 60 + 1.0 × 11.65 (the 25-year annuity factor at 7%) = USD 71.65 mn.
  • PV of the energy = 2.152 million MWh (4.54 million MWh in total, discounted).
  • LCOE = 71.65 ÷ 2.152 = USD 33.3 per MWh, in today’s money. The capital cost is 84% of it.

What moves it

For a plant paid for mostly up front, the discount rate and the capacity factor dominate. In the example, a rate of 5% or 9% gives 28.6 or 38.3; a capacity factor of 24% or 20% gives 30.5 or 36.6; the capital cost 10% lower or higher gives 30.5 or 36.1. Two points on the rate move the LCOE by about 15% — as much as 10% on the capital cost. Cheap, long-tenor debt and a good site matter as much as cheap panels.

The cost-based LCOE and the levelised tariff

The figure above is cost-based: capital and operating costs at one rate, usually the WACC, before tax. A bidder needs more — the tariff must also pay the tax, meet the lenders’ cover ratios and give the equity its return. The levelised tariff is the flat price that brings the equity to its target return in the full model. For the same plant, with 70% debt at 6% over 18 years, 25% tax and a 10% equity return, it is about USD 37.5 per MWh.

  • Comparing technologies or sites: the cost-based LCOE, all at the same rate.
  • Pricing a bid or testing a tariff: the levelised tariff from the full model. Its margin over the cost-based LCOE shows the room there is.

What to watch for

Real or nominal, and where it misleads

The example is in today’s money: USD 33.3 means a tariff that starts at 33.3 and rises with inflation. A tariff that stays flat in money terms must start higher — with 2.5% inflation, at about USD 41.5. Always say which one a figure is, and never compare a real LCOE with a nominal tariff.

  • Not every MWh is worth the same. Solar output arrives when prices are often lowest. Compare the LCOE with the price the plant captures, not an average price.
  • Firm power costs more. The LCOE ignores what the system pays to back up variable output. Storage is measured by the levelised cost of storage (LCOS), per MWh discharged.
  • Grid and balancing costs sit outside the plant’s LCOE unless they are added, as in the offtaker’s view.
  • Risk hides in the rate. A merchant plant and a contracted one with the same LCOE at the same rate are not equally good.

Pitfalls

  • Construction spending and interest during construction left out, or the start of the discounting not stated.
  • The gross output used instead of the energy sold after losses, availability and curtailment.
  • Replacement capital — inverters, augmentation, overhauls — and decommissioning forgotten.

Read and watch

The guide and the films

  • The guide · PDF, 4 pages

    LCOE — the levelised cost of energy

    Derived, worked on a 100 MW solar plant and stress-tested: the levelised tariff, three perspectives, real or nominal, and where it misleads.

  • Also in the Knowledge Center · PDF, 5 pages

    Valuing a project and its equity

    NPV, IRR, payback and MOIC; the cost of equity and the WACC; why the project and equity values differ; buying a stake; terminal value.

Common questions

Why is the energy discounted in the LCOE?

Because the revenue it earns is. The LCOE is the flat price at which the present value of the revenue equals the present value of the costs, and each year’s revenue is that price times that year’s energy. Dividing undiscounted costs by undiscounted energy gives a different, wrong number.

What discount rate should I use?

For a cost-based LCOE, usually the project’s WACC, before tax — and the same rate for every option you compare. Real cash flows go with a real rate, nominal ones with a nominal rate.

What is the difference between the LCOE and the levelised tariff?

The cost-based LCOE covers the capital and operating costs at one rate. The levelised tariff is the flat price at which the equity reaches its target return in the full model, after tax and the lenders’ cover ratios. In the guide’s example they are USD 33.3 and about USD 37.5 per MWh.

Is a lower LCOE always better?

No. Not every MWh is worth the same, firm power costs more, grid and balancing costs may sit outside it, and the risk hides in the discount rate. A merchant plant and a contracted one with the same LCOE at the same rate are not equally good.

In the Studio

Build this in Project Finance Studio

Output › Returns shows the cost-based LCOE with its parts, the revenue-based levelised tariff and the margin between them, the EPC view and the offtaker’s cost with grid charges — at the project’s WACC and at the offtaker’s own rate side by side, per kWh or per MWh. The inputs are in Valuation › Levelised cost of energy, and the Excel workbook calculates the same with XNPV on the model’s dates.